Before you install the unit, carefully unpack and check that you have all the:

important_icon IMPORTANT: The unit is provided with a wall framework that by default requires an installation that orientates to the left.

Preparing for Installation

For all installations, you must install the control timer unit at a place where:

caution_icon

CAUTION:

  • Make sure that you have the required installation cables.
  • Check that the voltage displayed on your generator label corresponds to your power supply voltage.
  • Check that jumper positions on the wall framework main powerboard matches the used voltage.