CS 2200 Maintenance
This section describes the maintenance tasks you must perform for your CS 2200.
Quarterly
Generator
Check that:
- The certification label is legible.
- No oil leaks.
Mechanical Support
Check that:
- The wall framework is securely attached to the wall.
- All labels are legible.
- The scissor arm is not worn out or damaged and is stable in all positions.
- The scissor arm plastic covers are firmly in place.
Control Timer Unit and Electrical Installation
Check that:
- The symbols are legible.
- The control timer unit and the power supply cables are in good condition.
- The X-ray exposure button returns to its initial position after use.
Operation
 |
WARNING: Be careful not to be exposed to ionizing radiation. |
Check that:
- The audible signal is heard and the X-ray emission indicator is visible when you make an exposure (manual mode, 60 kV, 0.1 sec).
- The “E01” message is displayed when you launch an X-ray (manual mode, 60 kV, 1.0 sec) and you release the control button before the exposure end.
Control Timer Unit Self-test
To enable the self-test, you must switch ON the CS 2200 system.
- The self-test starts with a simultaneous display and alarm light test.
- Then, the system test starts. After the test is completed (indicated by a short beep), the firmware version and the total number of exposures (divided by 10) performed by the unit since first installation are displayed.
- If the test fails, an error message is displayed.
 |
IMPORTANT: If a check result is not satisfactory, stop using the equipment and contact your representative. |
Annually
We recommend that an electrical, mechanical and dosimetric inspection of the unit be carried out by an authorized service technician provided by your representative.